GIES — Geo Inspection & Engineering Solution
A wing of Task Group, based in Dhaka

Know the ground before you build on it.

GIES carries out soil investigation, geotechnical laboratory testing and digital land survey for factories, buildings and infrastructure across Bangladesh. Every test follows a named standard, and every report says which one.

Since 2016ten years of field and lab work
BNBC 2020reports written for the national building code
ASTM & BStest methods named in every result
Borehole log BH-01SPT N-value per ASTM D1586
Illustrative log for a typical Dhaka-region site. SPT readings taken at 1.5 m intervals.

What we test and survey

Six services, each done in the field by our own crews and logged against a published method. Tell us what you are building and we will propose the scope it needs.

Soil investigation

  • Wash boring and auger boring to the depth your structure needs
  • Standard Penetration Test at regular intervals
  • Disturbed and undisturbed (Shelby tube) samples
  • Groundwater level and borehole logs for every bore

For factory sheds, multi-storey buildings, bridges, embankments and land development.

BNBC 2020 Pt 6 Ch 3ASTM D1586ASTM D1587ASTM D5434BS 5930

Geotechnical laboratory testing

  • Moisture content, unit weight, specific gravity
  • Grain size (sieve and hydrometer), Atterberg limits, soil classification
  • Unconfined compression, direct shear, triaxial (UU, CU)
  • Consolidation, compaction (Proctor) and CBR
ASTM D2216ASTM D4318ASTM D6913ASTM D2487ASTM D2166ASTM D2435BS 1377

Digital land & topographic survey

  • Total station and RTK GNSS (DGPS) survey
  • Spot levels and contour maps, tied to Survey of Bangladesh benchmarks
  • Plot demarcation, boundary and setting-out survey
  • Cut-and-fill and earthwork volume calculation
WGS 84 / UTMBTM gridPWD datumASPRS accuracy classes

Drone mapping

  • Orthomosaic maps and digital elevation models
  • Ground control points fixed by RTK GNSS
  • Site progress and as-built records for large sites
ASPRS Positional Accuracy 2023GCP-controlledCAAB flight rules

Load & integrity testing

  • Static pile load test (kentledge or reaction pile)
  • Pile integrity test and high-strain dynamic testing
  • Plate load test, field density and DCP for roads and fill
ASTM D1143ASTM D5882ASTM D4945IS 1888ASTM D1556ASTM D6951

Related site tests

  • Soil resistivity for earthing and substation design
  • Non-destructive concrete checks: rebound hammer, ultrasonic pulse velocity
  • Concrete core cutting and compressive strength
IEEE Std 81ASTM C805ASTM C597ASTM C42

The standards behind every result

A soil report is only as good as the method behind it. These are the codes our crews and laboratory work to. Each result in your report names the method used, so your structural engineer and approving authority can check it.

StandardWhat it coversHow we use it
BNBC 2020, Part 6, Ch. 3Bangladesh National Building Code: soils and foundationsNumber and depth of boreholes, bearing capacity, settlement and foundation recommendations
ASTM D1586Standard Penetration Test and split-barrel samplingSPT N-values at regular depth intervals in every borehole
ASTM D1587Thin-walled (Shelby) tube samplingUndisturbed samples from clay layers for strength and consolidation tests
ASTM D1452Soil exploration by auger boringShallow bores and sampling where wash boring is not needed
ASTM D2488Visual-manual description of soilsField description of each sample as it comes out of the ground
ASTM D5434Field logging of subsurface explorationsBorehole log format: strata, samples, SPT and groundwater
BS 5930:2015Code of practice for ground investigationsPlanning the investigation and reporting practice

The client's specification or consultant's requirement takes priority where it names a different method. We confirm the method list in the quotation.

How a job runs

The same five steps for a three-bore factory site or a hundred-acre survey. You get a fixed scope and price before we mobilise, and one report at the end.

  1. Scope & quotation

    We review your site plan and building load, then propose the number of bores, depth and tests under BNBC 2020.

  2. Mobilise

    Rig, crew and survey team reach site. Bore locations are set out and fixed by coordinates.

  3. Field work

    Boring, SPT, sampling and groundwater readings, logged on site and photographed.

  4. Laboratory

    Samples are sealed, labelled and tested in the lab to the methods listed in the quotation.

  5. Report

    Borehole logs, lab results and engineering recommendations, signed off and delivered in print and PDF.

Ten years in the field, one way of working

GIES started in 2016 as the ground investigation arm of Task Group, the design and construction group behind Task DNC. We now work for factory owners, real-estate developers, consultants and contractors, on sites from Ashulia and Gazipur to the coast.

A decade on, the practice has not changed: test to a named standard, log what the ground actually shows, and write recommendations a structural engineer can design from.

Our own crews

Field work is done by GIES drillers and surveyors, not subcontracted on the day.

Traceable samples

Each sample carries its bore, depth and date from the ground to the lab sheet.

Engineering input

Recommendations come from engineers who understand foundations, backed by Task Group's design team.

Clear quotations

Scope, methods and price agreed up front. Taxes and duties are stated separately.

What you receive

Reports are made for approval submissions and for the engineer who designs your foundation.

Borehole logs

Strata, soil classification, SPT N-values and groundwater level for every bore.

Laboratory sheets

Every test result with the method it was run to.

Foundation recommendations

Allowable bearing capacity, shallow or pile foundation advice, and estimated pile capacity.

Seismic & liquefaction notes

Site class and liquefaction screening where the soil profile needs it.

Survey drawings

AutoCAD (DWG) plans, contour maps and coordinate lists.

Maps & models

Orthomosaics, elevation models and GIS files from drone surveys.

Common questions

How many boreholes does my site need?

It depends on the plot size, building footprint and number of storeys. BNBC 2020 sets the minimum. For a typical factory shed or a six- to ten-storey building, three to five bores is common. Send us your site plan and we will propose the number in the quotation.

How deep do you bore?

Deep enough to reach a reliable bearing layer below the zone your foundation stresses. That is often 15 to 30 metres in the Dhaka region, deeper for heavy or tall structures.

How long does a soil test take?

Field work for a small site usually takes a few days. Laboratory testing and the report follow. We give you a delivery date in the quotation.

Will the report be accepted by RAJUK and other authorities?

Our reports follow BNBC 2020 and name every test method, which is what approving authorities and structural engineers look for.

How is payment arranged?

Usually 50% advance on the work order and the balance on report handover. All amounts exclude government taxes, VAT, AIT and excise duties.

Request a quotation

Call or email us with your site location and what you plan to build. We reply with a scope, the methods we will use, a price and a delivery date.

Hotline
+88 01325 095 646
Email
contact@giesbd.com
Head office
Level 02, House 10, Road 5E, Sector 11, Uttara, Dhaka 1230

To quote quickly, send us

  • Site location (mouza, upazila or a map pin)
  • Plot size and a site plan, if you have one
  • What you plan to build and how many storeys
  • Any test list from your consultant
Email your site details Message on WhatsApp